Scrum and Process

Scrum ceremonies are a chain. If refinement is broken, planning runs long. If planning is broken, the daily turns into a status report. This series covers the process from being agile to the roadmap, as it works in the field, not in the book.

The parts are written to be read in order; each one builds on the one before. In a hurry? Jump to the checklist at the end of each post.

22 posts

01 — 22 posts
SCRUM

Being Agile vs Doing Scrum

Agile does not end the chaos; it makes it visible. That is why teams can run every ceremony and still not be agile.

21 September 2025 · agile · manifesto · scrum
SCRUM

Scrum or Kanban: Not a Methodology, the Way Work Arrives

We took 9 items into the sprint and finished 4; 23 requests came from outside in the same two weeks. A decision table by how work arrives, and a rotating one-person Kanban lane.

28 September 2025 · kanban · hybrid model · unplanned work
SCRUM

Backlog Refinement: Kill Bad Ideas Early

Refinement is a funnel, not a meeting. Back-of-the-envelope filtering and ROI in one shared currency.

1 October 2025 · refinement · roi · prioritization
SCRUM

Grooming: Not a Ticket Reading Session

The PO's job is not to read out what will be built, but to explain why it matters.

12 October 2025 · grooming · product owner · context
SCRUM

Sprint Length: Not Two Weeks, the Speed of Feedback

Two days of work reached the user after more than nine weeks. We tried one-, two- and three-week sprints for eight sprints each: ceremony load, review attendance and feedback per month.

18 October 2025 · sprint · review · feedback
SCRUM

Sprint Planning: Commitment, Not Estimation

Good planning is boring. If surprises show up, the preparation failed. Capacity math and the pull system.

26 October 2025 · planning · capacity · pull system
SCRUM

Story Points: Not Time, Uncertainty

Asked “how many hours is one point?”, I said “five and a half”; an epic planned for 1.5 sprints took 5. Points turned into hours, inflated velocity and six sprints of #NoEstimates.

2 November 2025 · story points · velocity · NoEstimates
SCRUM

Daily Standup: Synchronization, Not a Status Report

If what you did yesterday does not affect today, it does not matter. Walking the board, and the async option.

8 November 2025 · daily · standup · async
SCRUM

Sprint Goal: One Sentence, Not a Ticket List

On day eight, four person-days of work did not fit. We argued for 40 minutes and dropped the item the campaign needed. A goal is the one sentence that tells you what to drop.

16 November 2025 · sprint goal · scope decision · planning
SCRUM

Sprint Review: A Feedback Loop, Not a Demo Show

If nobody objects, nobody is listening. Silence is the worst signal.

23 November 2025 · review · stakeholders · feedback
SCRUM

Definition of Ready: A Conversation Trigger, Not a Gate

A story that was not ready ate a third of the sprint. The 14-item gate I built in response blocked the work for three sprints. A checkbox asks for a yes; a question asks for a name.

29 November 2025 · definition of ready · planning · dependencies
SCRUM

Retrospective: Tracked Actions, Not Wishes

Definition, owner, deadline — without all three it is a wish, not an action.

6 December 2025 · retro · kaizen · psychological safety
SCRUM

Epic, Story, Task: How to Break Work Down and the 8-Hour Rule

Why should a task never exceed one day? Six ways to cut work, walked through a real e-commerce returns project.

20 December 2025 · user story · task breakdown · 8 hours
SCRUM

Definition of Done: A Quality Contract, Not a Checklist

A story we called done wrongly rejected 14.5% of withdrawal requests for 26 hours. The three layers of a DoD, who changes it, and keeping the work open when it breaks.

28 December 2025 · definition of done · quality · release
SCRUM

Does Scrum Make Customers Happy?

Bringing the customer inside: from 1 project to 9, from 1 person to a team of 14. A real story from the field.

4 January 2026 · customer · ownership · growth
SCRUM

WIP Limits: Flow Control, Not a Restriction

Six people, nine open items, and only 8 of 11 cards done at sprint end. Little’s Law in practice, a limit put on the wrong column, and a flow limit of 4 that cut cycle time from 11 days to 4.5.

11 January 2026 · WIP limit · Little’s Law · flow
SCRUM

Mid-Sprint Work: A Budget, Not a Ban

A “no new work” rule did not stop the work; it moved it to WhatsApp. The interruption card, a measured 15% share, swapping when the budget runs out, and the only valid reason to cancel a sprint.

8 February 2026 · unplanned work · capacity · sprint cancellation
SCRUM

Product Owner: The Person Who Says No, Not a Ticket Writer

Seven items, all P1; 67% of sprint work came from outside the PO’s order. Putting ordering authority in writing, the stand-in PO mistake, and the line with the tech lead.

8 March 2026 · product owner · prioritization · backlog
SCRUM

Do You Need a Scrum Master? A Function, Not a Role

When our Scrum Master left, the daily grew from 8 to 19 minutes and blockers waited six days. How we shared the work, three things that failed, and a decision by team size.

5 April 2026 · scrum master · facilitation · roles
SCRUM

Cycle Time: Not Velocity, the Time Your Customer Waits

Velocity rose from 34 to 52 while the customer waited 47 days for a fix. Cycle time vs lead time, p85 instead of the average, and flow efficiency.

3 May 2026 · cycle time · p85 · flow efficiency
SCRUM

“When Will It Be Done?”: Not One Date, a Range of Probabilities

I said “27 March” and we went live on 5 May. Past throughput, a 20-line Monte Carlo, and how to explain “85% likely by this date” to management.

31 May 2026 · forecasting · Monte Carlo · throughput
SCRUM

Roadmap: Ordered Bets, Not a List of Dates

Our dated Gantt chart fell apart in the first quarter, and the one item that finished on time did not help. Now / Next / Later, with every item written as a bet with a hypothesis, a measure and a stop condition.

26 July 2026 · roadmap · bets · sprint goal